Global Energy Storage

Neil Beveridge, Ph.D.

+852 2123 2648

neil.beveridge@bernsteinsg.com

Brian Ho, CFA

+852 2123 2615

brian.ho@bernsteinsg.com

Hengliang Zhang

+852 2123 2629

hengliang.zhang@bernsteinsg.com

China’s booming ESS demand growth is fueled by low battery prices and favorable ESS policies. China’s ESS battery prices have fallen by 50% since 2023 to RMB0.54/Wh (USD76/kWh) year-to-date. Recent prices have fallen further to RMB0.47/Wh (USD66/ kWh) or RMB1.00 (USD140/kWh) including EPC costs. While lower battery prices are a primary driver for ESS growth, increasing renewable penetration, ongoing power price reform, and local government ESS incentives have all been supportive.

Since 2023, the levelized cost of electricity (LCOE) for solar and storage (4-hrs) has fallen by 25% to \68/MWh.

Local governments’ capacity compensation schemes further enhance the returns on ESS investments. Assuming capacity compensation of RMB0.16/kWh (USD22/MWh) per charge, then this reduces the solar and storage LCOE to \$60/MWh. Many provinces have introduced relevant policies to give capacity compensation for new ESS capacity, and it is expected that nearly 20 provinces will follow up with such policies by the end of the year.

China’s wholesale benchmark prices based on coal-fired power generation ranges from USD35-65/MWh. In comparison, solar plus storage projects offer compelling economics, with costs around \43/MWh for a 2-hour storage system and \57/MWh for a 4-hour system. This cost advantage highlights significant growth potential.

Falling battery prices have enabled longer-duration storage solutions. Assuming electricity price of \140/kWh. Just a year ago, a project with similar return would only be competitive at 2-3 hours of storage.

We forecast global ESS demand to increase 93% to 581GWh in 2025 and reach 1588GWh by 2030 (23% CAGR). Our estimates are now 60% higher than initial estimates at the start of the year. With the integration of large-scale solar and wind power system, the grid will require more storage to maintain stability and for power shifting. We expect solar and wind capacity will grow from 3.3TW in 2024 to 8.5TW by 2030, representing 54% of total power capacity globally. We expect ESS capacity will reach 10% of renewable capacity in 2026 (from 1% four years ago) and rise to 19% by 2030. We also expect the storage duration to increase from 2.5 hours currently to 3.0 hours by 2030.

CATL and Sungrow stands as key beneficiaries of the ESS demand boom. Both companies are industry leaders with strong technological capabilities and robust market positions, well-positioned to capitalize on the accelerating demand for ESS. Among our coverage, CATL remains our top pick in the battery sector and leads with top ESS battery cells globally.

BERNSTEIN TICKER TABLE

<table><tr><td colspan="3"></td><td colspan="3">30 Sep 2025</td><td colspan="3">TTM Reported EPS</td><td colspan="4">Reported P/E (x)</td></tr><tr><td></td><td></td><td></td><td>Closing</td><td>Price</td><td>Rel.</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>Ticker</td><td>Rating</td><td>Cur</td><td>Price</td><td>Target</td><td>Perf.</td><td>Cur</td><td>2024A</td><td>2025E</td><td>2026E</td><td>2024A</td><td>2025E</td><td>2026E</td></tr><tr><td>300750.CH (CATL)</td><td>0</td><td>CNY</td><td>402.00</td><td>420.00</td><td>18.3%</td><td>CNY</td><td>11.52</td><td>15.43</td><td>19.66</td><td>34.9</td><td>26.1</td><td>20.5</td></tr><tr><td>247540.KS (EcoPro BM)</td><td>U</td><td>KRW</td><td>116,300</td><td>88,000</td><td>(56.5)%</td><td>KRW</td><td>(991.00)</td><td>(80.00)</td><td>405.00</td><td>(117.4)</td><td>N/M</td><td>287.2</td></tr><tr><td>051910.KS (LG Chem)</td><td>M</td><td>KRW</td><td>277,500</td><td>280,000</td><td>(39.9)%</td><td>KRW (8,826.00) (2,351.79)</td><td></td><td></td><td>14,663</td><td>(31.4)</td><td>(118.0)</td><td>18.9</td></tr><tr><td>373220.KS (LGES)</td><td>M</td><td>KRW</td><td>399,000</td><td>335,000</td><td>(25.4)%</td><td>KRW (4,353.59)</td><td></td><td>(246.62) 5,579.25</td><td></td><td>(91.6)</td><td>N/M</td><td>71.5</td></tr><tr><td>003670.KS (Posco Future M)</td><td>U</td><td>KRW</td><td>146,500</td><td>110,000</td><td>(58.3)%</td><td>KRW (2,740.96)</td><td></td><td>158.93 1,353.97</td><td></td><td>(53.4)</td><td>921.8</td><td>108.2</td></tr><tr><td>006400.KS (SDI)</td><td>M</td><td>KRW</td><td>206,500</td><td>200,000</td><td>(59.9)%</td><td>KRW</td><td>8,916.68 (4,552.19)</td><td></td><td>11,665</td><td>23.2</td><td>(45.4)</td><td>17.7</td></tr><tr><td>300274.CH</td><td>M</td><td>RMB</td><td>161.98</td><td>121.00</td><td>19.1%</td><td>RMB</td><td>5.31</td><td>6.19</td><td>6.91</td><td>30.5</td><td>26.2</td><td>23.4</td></tr><tr><td>002466.CH (Tianqi Lithium)</td><td>0</td><td>CNY</td><td>47.57</td><td>44.00</td><td>6.1%</td><td>CNY</td><td>(4.82)</td><td>0.60</td><td>1.76</td><td>(9.9)</td><td>79.0</td><td>27.0</td></tr><tr><td>9696.HK (Tianqi Lithium)</td><td>0</td><td>HKD</td><td>48.44 1,615.89</td><td>41.00</td><td>53.8%</td><td>CNY</td><td>(4.82)</td><td>0.60</td><td>1.76</td><td>(9.2)</td><td>73.6</td><td>25.1</td></tr><tr><td colspan="9"></td><td></td><td></td><td></td></tr></table>

O - Outperform, M - Market-Perform, U - Underperform, NR - Not Rated, CS - Coverage Suspended Source: Bloomberg, Bernstein estimates and analysis.

INVESTMENT IMPLICATIONS

ESS demand is growing much quicker than we expected as the cost of solar and storage have come down significantly. As power consumption continues to grow rapidly on data centers, EVs, air-conditioning, demand for energy storage will only increase. Moreover, the substitution of base load power (coal) with renewable energy will also likely increase for solar plus storage. Given the more positive view on energy storage, we have revised up our global 2030 ESS demand by 60% since the start of the year. CATL (rated Outperform) remains our top pick in the sector. Sungrow (rated Market-Perform) is also another way to invest in this theme.

WHAT’S DRIVING CHINA’S ESS DEMAND GROWTH?

China's ESS demand remains robust despite concerns following the release of Policy Document No. 136, which planned to remove the ESS mandate for renewable projects after May. Battery tenders is a leading indicator of battery installations. YTD, ESS tenders grew significantly by 167% y-o-y. According to S&E Consulting's tracking data, in August 2025, China's energy storage market completed tenders for a total of 25.8GW / 69.4GWh of ESS and EPC (including equipment) general contracting. Additionally, 13.3GWh of energy storage cells and DC-side procurement were finalized. The Inner Mongolia market showed particularly strong demand, completing 18.5GWh of ESS project procurement.

EXHIBIT 1: China’s ESS tenders grew by 167% y-o-y to 300GWh which will drive higher installations over the next 12M

Source: S&E Consulting, Bernstein analysis

China is experiencing a significant surge in demand for ESS, and this growth is mainly fueled by the substantial reduction in battery costs combined with a range of supportive policies aimed at promoting ESS adoption. Since 2023, the prices of ESS batteries in China have decreased dramatically by approximately 50%, reaching an average cost of RMB0.54/Wh (USD76/ kWh). Recent market data indicates that ESS prices have further dropped to RMB0.47/Wh (USD 66/kWh), and when including EPC costs, the total price amounts to about RMB1.00/Wh (USD140/kWh). This notable decline in battery prices serves as the primary catalyst for the rapid expansion of the ESS market in China, making energy storage solutions more financially accessible and attractive for various applications. However, the growth is not solely attributable to cost reductions.

EXHIBIT 2: Since 2023, the prices of ESS batteries in China have declined by 50%. Recent market data indicates that ESS prices have further dropped to RMB0.47/Wh or RMB1.00/Wh including EPC costs

Source: SMM, Bernstein analysis

EXHIBIT 3: In USD terms, ESS tender prices are at USD75/kWh or USD140/kWh including EPC ESS project tender prices (USD per kWh)

Source: SMM, Bernstein analysis

With Policy Document No. 136 being introduced in 2025, energy storage revenues are diversifying. Following this, some local governments have introduced capacity compensation schemes, creating alternative revenue streams for these projects. Additionally, gains from energy arbitrage are becoming increasingly significant in certain regions. In summary, China’s ESS projects can generate revenue through three main channels: capacity-based revenue, energy arbitrage, and ancillary services

• Capacity-based revenue: Capacity-based revenues guarantee the baseline income for ESS projects by ensuring its capacity availability during specific time periods. ESS projects operator can generate revenue based on either capacity leasing or capacity compensation. For capacity leasing, renewable projects used to be required to include a certain proportion of storage. Instead of building their own storage, project developers may lease required capacity from shared ESS stations. This provides the energy storage facility with long-term, stable contractual revenue. For capacity compensation, similar to the compensation paid to conventional thermal reserve units, the grid pays for the “availability” of storage assets to ensure capacity is ready when required. This mechanism provides a guaranteed baseline income for ESS projects

• Energy arbitrage: Energy arbitrage is the most fundamental and core profit-generating method for ESS projects, typically in two forms as well. Peak - valley arbitrage exploits the time-of-use (TOU) electricity pricing mechanism set by the government, charging when prices are low (off-peak or flat periods) and discharging when prices are high (peak or superpeak hours). Spot market arbitrage is a more dynamic model with higher potential returns. In regions where electricity spo markets are established, ESS projects can arbitrage real-time price fluctuations caused by supply and demand imbalances (especially those exacerbated by renewable energy intermittency).

• Ancillary services: ESS projects can also monetize their technical advantages of fast responses and generate substantial revenue in the ancillary services market, including both frequency regulation (stabilize grid frequency) and peaking service (address intra-day load peaks and valleys).

EXHIBIT 4: Several provinces have introduced policies supporting capacity compensation mechanisms, spot market arbitrage, and ancillary services, enhancing the attractiveness and returns of ESS projects in China <table><tr><td>Revenue channels</td><td colspan="2">Capacity based revenue</td><td colspan="2">Energy Arbitrage</td><td colspan="2">Ancillary Services</td></tr><tr><td></td><td>Capacity leasing</td><td>Capacity compensation mechanisms</td><td>Peak-valley price. spread arbitrage</td><td>Spot market arbitrage</td><td>Peaking service and compensation</td><td>Frequency regulation and compensation</td></tr><tr><td>% (based on 2023 Shandong project)</td><td>50%</td><td>15%</td><td>35%</td><td></td><td></td><td></td></tr><tr><td>Document 136 (Feb-25)</td><td>X</td><td></td><td></td><td></td><td></td><td></td></tr><tr><td colspan="7">Selective provinces with ESS and electricity trading mechanisms:</td></tr><tr><td>Shandong</td><td></td><td>+</td><td>+</td><td>+</td><td></td><td></td></tr><tr><td>Shanxi</td><td></td><td>+</td><td>+</td><td>+</td><td>+</td><td></td></tr><tr><td>Gansu</td><td></td><td>+</td><td>+</td><td>+</td><td>+</td><td></td></tr><tr><td>Hebei</td><td>+</td><td>+</td><td>+</td><td></td><td></td><td></td></tr><tr><td>Yunnan</td><td>+</td><td>+</td><td>+</td><td></td><td>+</td><td></td></tr></table>

Source: Government websites, Storage Discovery, S&E Consulting, Bernstein analysis

In March 2025, Inner Mongolia announced its capacity compensation policy for standalone ESS projects, which provides compensation for electricity discharged to the grid. For projects commissioned in 2025 or earlier, the compensation rate is set at RMB0.35/kWh. The compensation standard is valid for 10 years, with the rate for the following year updated every September. For a 100MW/400MWh ESS project, assuming a daily discharge amount equal to 60% of rated capacity (240MWh) and 250 operating days per year, the annual electricity generation would be 60MM kWh, corresponding to capacity compensation revenue of RMB21MM. Considering a total investment of RMB300MM (equivalent to a capital cost of US\$100/ kWh), the annual baseline income from capacity compensation accounts for about 7% of the total investment. While this is a significant contribution, most provinces are lower with Xinjiang at RMB0.16/kWh and Shandong at RMB0.20/kWh. Besides this, the project can earn additional revenue from energy arbitrage and ancillary services. The capacity compensation method may vary by region. For example, under new regulations issued in July 2025 in Gansu Province, eligible projects can receive a capacity compensation of RMB330 per kW per year. For the same 100MW/400MWh energy storage station, this corresponds to an annual capacity compensation income of RMB33MM, which represents about 10% of the total investment. In addition to this, in terms of energy arbitrage, we observe that more provinces are leading electricity price reforms towards greater market orientation. In 2025, Shandong Province not only introduced a "five-segment" time-of-use pricing policy but also clearly designated three months within the year as prime operational windows for "two charges and two discharges". All these changes could lead to a better return of ESS projects.

EXHIBIT 5: Capacity compensation based on discharge from ESS is a key driver of economics Energy storage capacity compensation

Source: Government data, Bernstein analysis

Provinces with higher penetration of renewables and ESS have been the first to establish ESS and electricity market mechanisms. As of 2024, in China renewables accounted for 45% of total power capacity, with around 5% supported by ESS projects. Leading provinces such as Xinjiang, Ningxia, and Inner Mongolia installed 55% of renewable capacity, with approximately 10% backed by ESS, mainly driven by energy storage mandate policies in our view. Equally important are other provinces where renewables make up about 35% of power capacity, but only 1-2% are supported by ESS projects.

EXHIBIT 6: Provinces with higher penetration of renewables and ESS have been the first to establish ESS and electricity market mechanisms (2024)

Source: Government websites, Bloomberg, Bernstein analysis

While these provinces have relatively high penetration of both ESS and renewable power, their levels remain below those of developed countries. With new ESS installations continuing to grow and tender volumes increasing even faster (which will be reflected into the new installations next 12M), we believe the ESS share will rise further and follow the trajectory of developed economies.

EXHIBIT 7: The higher % of interruptible power, the higher demand for ESS

Source: BNEF, Bernstein analysis and estimates

ECONOMICS OF CHINA’S SOLAR AND STORAGE PROJECT

We have carried out an analysis of what the economics would look like for a solar and storage development in Xinjiang, China. Building solar capacity in Xinjiang offers significant advantages due to the region's abundant solar resources, characterized by high solar irradiance and vast available land, enabling large-scale, cost-effective solar power generation. Additionally, favorable government policy and expanding transmission infrastructure support export of electricity.

In our theoretical development, we assume a 1GW solar project. We have used Renewables Ninja to generate the load curve for the project with a 1-axis tilt and azimuth. On average, the annual capacity factor is approximately 24% assuming no curtailment.

EXHIBIT 8: We have modeled a 1GW solar project in Xinjiang. The solar farm can achieve an average capacity factor of 24% assuming no curtailment

Source: Renewables Ninja, Bernstein analysis

Solar has significant variability in capacity factor by months and hours of the day. Capacity factors are generally higher in summer months with longer daylight hours and stronger solar irradiance. Solar power generation are typically between 6am to 5pm with peak generation between 10am to 1pm where the sun’s ray strikes the panels most directly.

EXHIBIT 9: Solar power is generated between 6am to 5pm with peak generation between 10am to 1pm

Source: Renewables Ninja, Bernstein analysis

The hourly generation profile below illustrates significant volatility in electricity generation without storage. Power generation drops to zero during peak evening hours. For a 1GW solar farm, the solar project can generate 2.1TWh of electricity annually.

EXHIBIT 10: Hourly output of a 1GW solar farm in Xinjiang. Annually, the project could generate 2.1TWh of electricity. Without storage, output drops to zero during peak evening hours

Source: Renewables Ninja, NDRC, Bernstein analysis

While the solar project can theoretically achieve 24% capacity factor, realistically utilization is lower due to curtailment due to mismatch in supply and demand. The power load curve shows the electricity demand throughout a day. Generally, the load curve peaks during the morning and early evening hours when residential, commercial, and industrial activities are at their highest, while it troughs during late night and early morning hours when demand is minimal. We model the power load curve of China’s Eastern provinces to assess solar’s economics.

EXHIBIT 11: We model the power load curve of China’s Eastern provinces to assess solar’s economics

Source: NDRC, Renewables Ninja, Bernstein analysis

Solar power generation is often curtailed when its peak production, typically around midday, exceeds the electricity demand as shown by the power load curve. This mismatch leads to intentional reduction of solar output to maintain grid stability and prevent overloads. Curtailment results from limited grid flexibility and insufficient storage.

EXHIBIT 12: While the solar project can theoretically achieve 24% capacity factor, realistically utilization is lower due to curtailment during midday

Source: NDRC, Renewables Ninja, Bernstein analysis

After factoring in curtailment, the actual solar power generation from the project is effectively reduced to match the power load during midday. As a result, the generation profile shows lower output during periods when the grid cannot absorb all the solar energy produced. This means the net generation curve is clipped or flattened at these times. Consequently, the curtailment results in lower project revenue and efficiency metrics. After factoring in the curtailment, capacity factor for the system falls to 11%.

EXHIBIT 13: Actual solar power generation is effectively reduced to match the power load during midday. After factoring the curtailment, capacity factor for the system falls to 11%

Source: NDRC, Renewables Ninja, Bernstein analysis

Batteries help to store excess power and discharge during higher power load in the morning and evening. Sizing battery storage alongside solar requires a detailed analysis of solar generation and load demand profiles to optimize system performance and cost-efficiency. Key factors include understanding the timing and magnitude of solar output and electricity consumption, determining the required storage duration for balancing supply and demand, and accounting for battery characteristics such as depth of discharge and efficiency. The sizing strategy aims to maximize consumption and ensure reliability during periods of low solar generation. A well-established system prevents power shortfalls and excessive capital investment, enhancing the overall value proposition of solar-plus-storage projects

EXHIBIT 14: Two hours can be cost-effective solution for peak shaving but may be insufficient for providing extended backup power and grid resilience during lower sunlight conditions

Source: NDRC, Bernstein analysis

For projects aiming primarily at peak shaving and short-duration grid support, two hours can be a cost-effective solution. Two hours of storage can effectively smooth short-term fluctuations in solar generation and cover peak demand periods immediately following sunset. However, it may be insufficient for providing extended backup power during prolonged lowsunlight conditions or for shifting solar energy to cover late-night or early-morning demand. For greater energy resilience or higher grid independence, longer-duration storage would be necessary.

EXHIBIT 15: Two hours of storage can smooth short-term fluctuations and cover peak demand periods immediately following sunset. However, it may be insufficient for providing extended backup power

Source: Renewables Ninja, NDRC, Bernstein analysis

For our analysis, a four-hours battery storage system is a significant improvement for power load balancing but there are still intervals of no power generation especially during the winter months. This highlights the ongoing challenge of limited solar availability during periods of low sunlight, underscoring the need for additional measures to ensure consistent energy supply throughout the year.

EXHIBIT 16: Despite the installation of four hours of battery storage aimed at improving power load balancing, the system continues to experience intervals of no power generation especially during the winter months

Source: Renewables Ninja, NDRC, Bernstein analysis

Below is a summary of the key operating metrics for various solar-plus-storage configurations. Without storage, the solar project’s utilization is limited to just 11% due to curtailment, with the system generating power only about 50% of the time. Introducing a 2-hour storage system increases utilization to 19%, as excess midday solar power is stored with the battery reaching a depth of discharge (DoD) of 90%. This also boosts system uptime to nearly 80%. Expanding to a 4-hour storage system further improves utilization to 21%, though the battery DoD decreases to 59%, while uptime rises to 90%. Beyond 4 hours, such as with a 6-hour storage system, gains become marginal, indicating that extending storage duration beyond 4 hours may not be economically justified.

EXHIBIT 17: Key operating metrics for various solar-plus-storage configurations <table><tr><td></td><td></td><td>No ESS</td><td>2-hr ESS</td><td>4-hr ESS</td><td>6-hr ESS</td></tr><tr><td>Daily power load</td><td>MW</td><td>5,725</td><td>5,725</td><td>5,725</td><td>5,725</td></tr><tr><td>Solar</td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>Capacity</td><td>MW</td><td>1000</td><td>1000</td><td>1000</td><td>1000</td></tr><tr><td>Effective utilization</td><td>%</td><td>11%</td><td>19%</td><td>21%</td><td>22%</td></tr><tr><td>Electricity generation</td><td>GWh</td><td>1,005</td><td>1,652</td><td>1,866</td><td>1,906</td></tr><tr><td>Daily generation</td><td>MW</td><td>2,754</td><td>4,527</td><td>5,112</td><td>5,221</td></tr><tr><td>Battery</td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>Battery size</td><td>MWh</td><td>0</td><td>2,000</td><td>4,000</td><td>6,000</td></tr><tr><td>Duration</td><td>hours</td><td>0</td><td>2</td><td>4</td><td>6</td></tr><tr><td>DoD per day</td><td>%</td><td>0%</td><td>89%</td><td>59%</td><td>41%</td></tr><tr><td>Combined</td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>Uptime</td><td>%</td><td>51%</td><td>79%</td><td>90%</td><td>91%</td></tr></table>

Source: NDRC, Renewables Ninja, Bernstein analysis

Below we show our assumptions for a solar project with 4-hours of storage (1GW/4GWh). On capital cost, we assume a unit capex of \600/kW for the solar plant which equates to \600M. The ESS would be \560M assuming a cost of \140/kWh. We assume that the solar plant is running at a capacity factor of 21% and assume a 60% depth of discharge for the battery. The charging cost is effectively zero when using excess solar energy that would otherwise be curtailed. Based on the analysis, we estimate the LCOE for the project is \$68/MWh assuming at 8% IRR.

EXHIBIT 18: Our assumptions for a solar project with 4-hours of storage (1GW/4GWh). We estimate an LCOE of \$68 MWh <table><tr><td rowspan=1 colspan=1>Solar Assumptions</td><td rowspan=1 colspan=1>Units</td><td rowspan=1 colspan=1>Value</td></tr><tr><td rowspan=1 colspan=1>Capacity</td><td rowspan=1 colspan=1>MW</td><td rowspan=1 colspan=1>1,000</td></tr><tr><td rowspan=1 colspan=1>Capacity factor</td><td rowspan=1 colspan=1>%</td><td rowspan=1 colspan=1>22%</td></tr><tr><td rowspan=1 colspan=1>Electricity generation</td><td rowspan=1 colspan=1>GWh</td><td rowspan=1 colspan=1>1,927</td></tr><tr><td rowspan=1 colspan=1>Capital intensity</td><td rowspan=1 colspan=1>M</td><td rowspan=1 colspan=1>600</td></tr><tr><td rowspan=1 colspan=1>Fixed O&amp;M cost</td><td rowspan=1 colspan=1>$/kW/year</td><td rowspan=1 colspan=1>12.0</td></tr></table>

<table><tr><td rowspan=1 colspan=1>Energy Storage Assumptions</td><td rowspan=1 colspan=1>Units</td><td rowspan=1 colspan=1>Value</td></tr><tr><td rowspan=1 colspan=1>Energy Storage</td><td rowspan=1 colspan=1>MWh</td><td rowspan=1 colspan=1>4,000</td></tr><tr><td rowspan=1 colspan=1>Capital intensity</td><td rowspan=1 colspan=1>M</td><td rowspan=1 colspan=1>560</td></tr><tr><td rowspan=1 colspan=1>DoD Cycles/Day</td><td rowspan=1 colspan=1>%</td><td rowspan=1 colspan=1>60%</td></tr><tr><td rowspan=1 colspan=1>Annual Degradation</td><td rowspan=1 colspan=1>%</td><td rowspan=1 colspan=1>3%</td></tr><tr><td rowspan=1 colspan=1>Efficiency</td><td rowspan=1 colspan=1>%</td><td rowspan=1 colspan=1>90%</td></tr><tr><td rowspan=1 colspan=1>Number of cycles</td><td rowspan=1 colspan=1>Times</td><td rowspan=1 colspan=1>2190</td></tr></table>

<table><tr><td rowspan=1 colspan=1>Economics</td><td rowspan=1 colspan=1>Units</td><td rowspan=1 colspan=1>Value</td></tr><tr><td rowspan=1 colspan=1>IRR</td><td rowspan=1 colspan=1>%</td><td rowspan=1 colspan=1>8%</td></tr><tr><td rowspan=1 colspan=1>LCOE</td><td rowspan=1 colspan=1>$/MWh</td><td rowspan=1 colspan=1>68</td></tr></table>

Source: Bernstein analysis

We compare the LCOE analysis last year to current cost including and excluding government’s capacity compensation. Last year a 4hr system would cost \76/MWh with ESS price at \185/kWh. With current ESS cost at \63/MWh. Assuming capacity compensation of RMB0.16/Wh (USD22/MWh) per discharge based on current policy in Xinjiang, then this reduces the LCOE to \$60/MWh. Many provinces have introduced relevant policies to give capacity compensation for new ESS capacity, and it is expected that nearly 20 provinces will follow up with such policies by the end of

the year.

EXHIBIT 19: Assuming capacity compensation of RMB0.16/Wh (USD22/MWh) per discharge, then this reduces the LCOE to \$60/MWh <table><tr><td>LCOE (/kWh)</td><td>185</td><td>140</td><td></td><td>140</td><td></td></tr><tr><td>Capacity compensation ($/MWh)</td><td>0.0</td><td>0.0</td><td></td><td>22.2</td><td></td></tr></table>

Source: Bernstein analysis

China’s solar and storage costs are competitive across China. China’s wholesale benchmark prices based on coal-fired power generation ranges from USD35-65/MWh. A 2 to 4-hr system is economically attractive across most key provinces, underscoring their growth potential.

EXHIBIT 20: Current solar and storage projects are competitive across China Benchmark wholesale electricity prices

Source: State Power Investment Economic Research Institute, Bernstein analysis

The LCOE for solar plus storage has reached a competitive level with that of coal-fired power generation. This cost parity makes solar plus storage an economically viable alternative to coal, enabling more flexible, cleaner, and sustainable energy supply without compromising reliability. Consequently, solar plus storage is increasingly favored in energy markets seeking to reduce carbon emissions while maintaining cost-effectiveness.

EXHIBIT 21: The LCOE for solar plus storage has reached a competitive level with that of coal-fired power generation LCOE - Coal vs solar plus storage (US\$/MWh)

Source: Bernstein analysis

Falling battery prices have also enabled longer-duration storage solutions. Assuming electricity price of \140/kWh. Just a year ago, a project with similar return would only be able to install 2-3 hours of storage.

EXHIBIT 22: IRR sensitivity to battery system prices

IRR sensitivity for solar + storage projects

Assuming: 1GW Solar capacity; Electricity price of \$50/MWh

<table><tr><td rowspan="2"></td><td rowspan="2">Utilization %</td><td rowspan="2">Generation TWh</td><td colspan="10">Battery system price ($/kWh)</td></tr><tr><td>60</td><td>80</td><td>100</td><td>120</td><td>140</td><td>160</td><td>180</td><td>200</td><td>220</td><td>240</td></tr><tr><td>Solar only (no curtailment)</td><td>24%</td><td>2.10</td><td>16%</td><td>16%</td><td>16%</td><td>16%</td><td>16%</td><td>16%</td><td>16%</td><td>16%</td><td>16%</td><td>16%</td></tr><tr><td>Solar only (with curtailment)</td><td>12%</td><td>1.05</td><td>6%</td><td>6%</td><td>6%</td><td>6%</td><td>6%</td><td>6%</td><td>6%</td><td>6%</td><td>6%</td><td>6%</td></tr><tr><td>Solar + 2hr storage</td><td>19%</td><td>1.66</td><td>13%</td><td>13%</td><td>12%</td><td>11%</td><td>10%</td><td>10%</td><td>9%</td><td>9%</td><td>8%</td><td>8%</td></tr><tr><td>Solar + 4hr storage</td><td>22%</td><td>1.93</td><td>12%</td><td>11%</td><td>10%</td><td>9%</td><td>8%</td><td>7%</td><td>6%</td><td>6%</td><td>5%</td><td>4%</td></tr></table>

Source: Bernstein analysis

CHINA ESS BATTERY DEMAND OUTLOOK

How much battery storage is needed is dependent on (a) total power demand which drives overall capacity (b) the amount of renewable energy which will be installed for power generation and (c) how much energy storage is required by batteries (versus other forms of energy storage). The greater the penetration of solar and wind in the power mix, the higher the penetration of battery energy storage. At penetration rates of 60-70% of the grid then 15% or more of capacity will have to be backed up by batteries. We forecast ESS demand to rise 89% to 335GWh in 2025 and 855GWh in 2030, reflecting a 20% CAGR.

EXHIBIT 23: We forecast ESS demand to rise 89% to 335GWh in 2025 and 855GWh in 2030, reflecting a 20% CAGR

Source: Government websites, Bloomberg, InfoLink, Bernstein analysis and estimates

Renewables expected to account for 70% of the power capacity mix by 2030. Battery energy storage systems are well suited for short-duration storage (<12hrs) which involves charging and discharging over a span of hours. This makes battery storage highly complementary with wind and solar. The underlying assumption is that over the next five years, the annual addition of new solar and wind capacity will remain at the 2025 level, approximately 500 to 550 GW per year, with 263 GW already added in 1H2025. This growth trajectory will increase total installed renewable capacity to 4,796 GW by 2030, up from 1,569 GW in 2024, representing 70% of the total power capacity in China.

23% of renewables backed up by ESS by 2030. With the integration of large-scale solar and wind power system, the grid will require more storage to deal with undersupply and curtailment of power. Battery storage will help improve the stability of power supply and help with peak regulation and frequency regulation. Based on current tender volumes, which will translate into new ESS installations by 2026, it is relatively clear that ESS capacity will reach 10% of renewable capacity, a significant increase from 1% four years ago. Continuing this trend and with more renewables connecting to the grid, we expect the ESS share to rise to 23% by 2030.

3-hour duration of ESS by 2030. In China, more grid-scale ESS policies designed for longer-duration energy storage came out over the past year, which will fuel the demand for ESS batteries further. In China, most provinces ruled the storage duration to be at 2 hours, among which regions with rich solar and wind resources, for example Xinjiang and Tibet, required 4 hours. Longer duration energy storage systems are on the rise.

EXHIBIT 24: China’s ESS demand outlook <table><tr><td></td><td>2020</td><td>2021</td><td>2022</td><td>2023</td><td>2024</td><td>2025E</td><td>2026E</td><td>2027E</td><td>2028E</td><td>2029E</td><td>2030E</td><td>2050E</td></tr><tr><td>Total power capacity (GW)</td><td>2,150</td><td>2,328</td><td>2,518</td><td>2,907</td><td>3,392</td><td>4,031</td><td>4,622</td><td>5,177</td><td>5,736</td><td>6,300</td><td>6,872</td><td>17,976</td></tr><tr><td>Total solar and wind capacity (GW)</td><td>550</td><td>662</td><td>807</td><td>1,144</td><td>1,569</td><td>2,074</td><td>2,593</td><td>3,124</td><td>3,669</td><td>4,226</td><td>4,796</td><td>16,196</td></tr><tr><td>Share of solar and wind (%)</td><td>26%</td><td>28%</td><td>32%</td><td>39%</td><td>46%</td><td>51%</td><td>56%</td><td>60%</td><td>64%</td><td>67%</td><td>70%</td><td>90%</td></tr><tr><td>Net added solar and wind capacity (GW) y-o-y (%)</td><td>125</td><td>112</td><td>145</td><td>337</td><td>425</td><td>506</td><td>519</td><td>532</td><td>545</td><td>558</td><td>570</td><td>570</td></tr><tr><td></td><td></td><td>-10%</td><td>29%</td><td>133%</td><td>26%</td><td>19%</td><td>3%</td><td>3%</td><td>2%</td><td>2%</td><td>2%</td><td>0%</td></tr><tr><td>Cumulative ESS capacity (GW)</td><td>3</td><td>5</td><td>11</td><td>33</td><td>72</td><td>139</td><td>265</td><td>444</td><td>650</td><td>876</td><td>1,114</td><td>4,859</td></tr><tr><td>As of total capacity (%) As of solar and wind capacity (%)</td><td>0%</td><td>0%</td><td>0%</td><td>1%</td><td>2%</td><td>3%</td><td>6%</td><td>9%</td><td>11%</td><td>14%</td><td>16%</td><td>27%</td></tr><tr><td>Net added ESS capacity (GW)</td><td>1%</td><td>1%</td><td>1%</td><td>3%</td><td>5%</td><td>7%</td><td>10%</td><td>14%</td><td>18%</td><td>21%</td><td>23%</td><td>30%</td></tr><tr><td>y-o-y (%)</td><td>1</td><td>2</td><td>6</td><td>22</td><td>39</td><td>67</td><td>126</td><td>179</td><td>206</td><td>226</td><td>238</td><td>202</td></tr><tr><td></td><td></td><td>79%</td><td>131%</td><td>290%</td><td>77%</td><td>72%</td><td>87%</td><td>43%</td><td>15%</td><td>10%</td><td>6%</td><td>-1%</td></tr><tr><td>Duration (hours)</td><td>1.7</td><td>1.8</td><td>2.0</td><td>2.1</td><td>2.3</td><td>2.5</td><td>2.6</td><td>2.7</td><td>2.8</td><td>2.9</td><td>3.0</td><td>4.5</td></tr><tr><td>Cumulative ESS capacity (GWh)</td><td>5</td><td>10</td><td>22</td><td>68</td><td>167</td><td>341</td><td>675</td><td>1,179</td><td>1,795</td><td>2,510</td><td>3,310</td><td>21,865</td></tr><tr><td>Annual battery installation (GWh)</td><td>2</td><td>5</td><td>12</td><td>47</td><td>99</td><td>173</td><td>335</td><td>504</td><td>615</td><td>715</td><td>800</td><td>1,221</td></tr><tr><td>y-0-y</td><td></td><td>86%</td><td>167%</td><td>278%</td><td>113%</td><td>75%</td><td>93%</td><td>51%</td><td>22%</td><td>16%</td><td>12%</td><td>3%</td></tr><tr><td>Annual ESS battery shipment/demand (GWh)</td><td>5</td><td>12</td><td>37</td><td>82</td><td>177</td><td>335</td><td>504</td><td>615</td><td>715</td><td>800</td><td>855</td><td>1,259</td></tr><tr><td>y-o-y</td><td></td><td>167%</td><td>201%</td><td>122%</td><td>116%</td><td>89%</td><td>51%</td><td>22%</td><td>16%</td><td>12%</td><td>7%</td><td>3%</td></tr></table>

Source: Government websites, Bloomberg, InfoLink, Bernstein analysis and estimates

Competition among companies in China’s ESS market has intensified. CATL leads as the top ESS battery cell manufacturer in China, holding a 26% market share, followed by Hithium with 17%, EVE Energy at 13%, and Rept at 11%. The companies most exposed to the China ESS battery market include Great Power, Hithium, Rept, and EVE Energy. Within our coverage, CATL derives approximately 10% of its battery sales from the China ESS market and another 10% from overseas. Although the rapid growth in China’s ESS battery demand has somewhat been offset by CATL’s market share loss, the market-oriented pricing mechanism introduces some positive implications for market leaders, however. Specifically, since capacity compensation is valid for 10 years, projects with longer life cycles yield better returns. Additionally, in leading provinces such as Shandong, where ESS projects benefit from “two charges and two discharges per day” to engage in energy arbitrage, factors like battery longevity and performance characteristics like depth of discharge, are becoming increasingly critical. These factors collectively increase the value placed on battery technology, quality, and brand reputation, ultimately benefiting the industry leaders.

CATL Hithium EVE Energy Rept CALB BYD Gotion Envision Great Power Others

EXHIBIT 25: In China, CATL is the leading ESS battery cell manufacturer with a 26% market share, followed by Hithium at 17%, EVE Energy at 13%, and Rept at 11%

China ESS battery cell shipment (GWh, 1H25)

Source: InfoLink, Bernstein analysis

GLOBAL ESS BATTERY DEMAND OUTLOOK

Since the beginning of the year, we have adopted a more positive outlook on ESS and significantly elevated our forecast to capture the higher ESS penetration driven by improved economics and the critical role of ESS in ensuring grid stability Since the start of the year, we have revised up 2025 global ESS demand growth from 30% to 93% to 581GWh. Looking further ahead, our long-term expectations for 2030 have also been increased by 60% since initial estimates from 983GWh to 1,588GWh. Overall, the increase in ESS underscores the importance of ESS technologies as economic viability improves and the importance for grid resilience intensifies worldwide.

EXHIBIT 26: Global ESS battery demand outlook <table><tr><td></td><td>2020</td><td>2021</td><td>2022</td><td>2023</td><td>2024</td><td>2025E</td><td>2026E</td><td>2027E</td><td>2028E</td><td>2029E</td><td>2030E</td><td>2050E</td></tr><tr><td>Total power capacity (GW)</td><td>7,681</td><td>8,038</td><td>8,473</td><td>9,137</td><td>9,936</td><td>10,835</td><td>11,789</td><td>12,803</td><td>13,768</td><td>14,762</td><td>15,804</td><td>34,675</td></tr><tr><td>Total solar and wind capacity (GW)</td><td>1,522</td><td>1,787</td><td>2,105</td><td>2,663</td><td>3,362</td><td>4,167</td><td>5,012</td><td>5,881</td><td>6,742</td><td>7,628</td><td>8,554</td><td>30,274</td></tr><tr><td>Share of solar and wind (%)</td><td>20%</td><td>22%</td><td>25%</td><td>29%</td><td>34%</td><td>38%</td><td>43%</td><td>46%</td><td>49%</td><td>52%</td><td>54%</td><td>87%</td></tr><tr><td>Net added solar and wind capacity (GW)</td><td>262</td><td>265</td><td>318</td><td>558</td><td>699</td><td>805</td><td>845</td><td>868</td><td>861</td><td>886</td><td>925</td><td>1,246</td></tr><tr><td>y-o-y (%)</td><td></td><td>1%</td><td>20%</td><td>75%</td><td>25%</td><td>15%</td><td>5%</td><td>3%</td><td>-1%</td><td>3%</td><td>4%</td><td>1%</td></tr><tr><td>Cumulative ESS capacity (GW)</td><td>18</td><td>27</td><td>45</td><td>89</td><td>164</td><td>286</td><td>479</td><td>733</td><td>1,010</td><td>1,317</td><td>1,647</td><td>8,327</td></tr><tr><td>As of total capacity (%)</td><td>0%</td><td>0%</td><td>1%</td><td>1%</td><td>2%</td><td>3%</td><td>4%</td><td>6%</td><td>7%</td><td>9%</td><td>10%</td><td>24%</td></tr><tr><td>As of solar and wind capacity (%)</td><td>1%</td><td>2%</td><td>2%</td><td>3%</td><td>5%</td><td>7%</td><td>10%</td><td>12%</td><td>15%</td><td>17%</td><td>19%</td><td>28%</td></tr><tr><td>Net added ESS capacity (GW)</td><td>6</td><td>10</td><td>17</td><td>45</td><td>74</td><td>122</td><td>193</td><td>254</td><td>277</td><td>307</td><td>330</td><td>343</td></tr><tr><td>y-o-y (%)</td><td></td><td>63%</td><td>81%</td><td>155%</td><td>67%</td><td>64%</td><td>58%</td><td>32%</td><td>9%</td><td>11%</td><td>7%</td><td>1%</td></tr><tr><td>Duration (hours)</td><td>2.0</td><td>2.1</td><td>2.1</td><td>2.1</td><td>2.3</td><td>2.5</td><td>2.8</td><td>2.9</td><td>3.1</td><td>3.2</td><td>3.3</td><td>3.9</td></tr><tr><td>Cumulative ESS capacity (GWh)</td><td>35</td><td>56</td><td>93</td><td>189</td><td>370</td><td>725</td><td>1,322</td><td>2,161</td><td>3,116</td><td>4,222</td><td>5,460</td><td>32,149</td></tr><tr><td>Annual battery installation (GWh)</td><td>12</td><td>22</td><td>37</td><td>96</td><td>183</td><td>358</td><td>612</td><td>865</td><td>1,020</td><td>1,200</td><td>1,365</td><td>3,526</td></tr><tr><td>y-0-y</td><td>76%</td><td>78%</td><td>70%</td><td>159%</td><td>91%</td><td>96%</td><td>71%</td><td>41%</td><td>18%</td><td>18%</td><td>14%</td><td>3%</td></tr><tr><td>Annual ESS battery shipment/demand (GWh)</td><td>21</td><td>44</td><td>121</td><td>185</td><td>301</td><td>581</td><td>865</td><td>1,020</td><td>1,200</td><td>1,365</td><td>1,588</td><td>3,632</td></tr><tr><td>y-o-y</td><td>73%</td><td>114%</td><td>175%</td><td>53%</td><td>63%</td><td>93%</td><td>49%</td><td>18%</td><td>18%</td><td>14%</td><td>16%</td><td>3%</td></tr></table>

Source: Government websites, Bloomberg, InfoLink, Bernstein analysis and estimates

I. REQUIRED DISCLOSURES

References to "Bernstein" or the “Firm” in these disclosures relate to the following entities: Bernstein Institutional Services LLC (April 1, 2024 onwards), Sanford C. Bernstein & Co., LLC (pre April 1, 2024), Bernstein Autonomous LLP, BSG France S.A. (April 1, 2024 onwards), Sanford C. Bernstein (Hong Kong) Limited 盛博香港有限公司, Sanford C. Bernstein (Canada) Limited, Sanford C. Bernstein (India) Private Limited (SEBI registration no. INH000006378), Sanford C. Bernstein (Singapore) Private Limited and Sanford C. Bernstein Japan KK (サンフォード・C・バーンスタイン株式会社).

On April 1, 2024, Société Générale (SG) and AllianceBernstein, L.P. (AB) completed a transaction that created a new joint venture in which their respective cash equities and research businesses operate in a new business combination. Although their respective ownership percentages in the joint venture differ between North America and the rest of the world, the creation, production and publication of research is handled collaboratively on a global basis across the two research brands, “Bernstein” and “Autonomous”. Unless specifically noted otherwise, for purposes of these disclosures, references to Bernstein’s “affiliates” relate to both SG and AB and their respective affiliates.

VALUATION METHODOLOGY

This research publication covers six or more companies. For valuation methodology and other company disclosures:

Please visit: https://bernstein-autonomous.bluematrix.com/sellside/Disclosures.action.

Or, you can also write to the Director of Compliance, Bernstein Institutional Services LLC, 245 Park Avenue, New York, NY 10167.

RISKS

This research publication covers six or more companies. For risks and other company disclosures: Please visit: https://bernstein-autonomous.bluematrix.com/sellside/Disclosures.action. Or, you can also write to the Director of Compliance, Bernstein Institutional Services LLC, 245 Park Avenue, New York, NY 10167.

RATINGS DEFINITIONS, BENCHMARKS AND DISTRIBUTION

EQUITY RATINGS DEFINITIONS

Bernstein brand

The Bernstein brand rates stocks based on forecasts of relative performance for the next 12 months versus the S&P 500 for stocks listed on the U.S. and Canadian exchanges, versus the Bloomberg Europe Developed Markets Large and Mid Cap Price Return Index (EDM) for stocks listed on the European exchanges and emerging markets exchanges outside of the Asia Pacific region, versus the Bloomberg Japan Large and Mid Cap Price Return Index USD (JP) for stocks listed on the Japanese exchanges, and versus the Bloomberg Asia ex-Japan Large and Mid Cap Price Return Index (ASIAX) for stocks listed on the Asian (ex-Japan) exchanges -unless otherwise specified.

The Bernstein brand has three categories of ratings:

• Outperform: Stock will outpace the market index by more than 15 pp

• Market-Perform: Stock will perform in line with the market index to within +/-15 pp

• Underperform: Stock will trail the performance of the market index by more than 15 pp

Coverage Suspended: Coverage of a company under the Bernstein research brand has been suspended. Ratings and price targets are suspended temporarily, are no longer current, and should therefore not be relied upon.

Not Rated: A rating assigned when the stock cannot be accurately valued, or the performance of the company accurately predicted, at the present time. The covering analyst may continue to publish research reports on the company to update investors on events and developments.

Not Covered (NC) denotes companies that are not under coverage.

Bernstein brand stock ratings are based on a 12-month time horizon.

Autonomous brand – common stocks

The Autonomous brand rates common stocks as indicated below. As our benchmarks we use the Bloomberg Europe 500 Banks And Financial Services Index (BEBANKS) and Bloomberg Europe Dev Mkt Financials Large and Mid Cap Price Ret Index EUR (EDMFI) index for developed European banks and Payments, the Bloomberg Europe 500 Insurance Index (BEINSUR) for European insurers, the S&P 500 and S&P Financials for US banks and Payments coverage, S5LIFE for US Insurance, the S&P Insurance Select Industry (SPSIINS) for US Non-Life Insurers coverage, and the Bloomberg Emerging Markets Financials Large, Mid and Small Cap Price Return Index (EMLSF) for emerging market banks and insurers and Payments. Ratings are stated relative to the sector (not the market).

The Autonomous brand has three categories of common stock ratings:

• Outperform (OP): Stock will outpace the relevant index by more than 10 pp

• Neutral (N): Stock will perform in line with the market index to within +/-10 pp

• Underperform (UP): Stock will trail the performance of the relevant index by more than 10 pp

Coverage Suspended: Coverage of a company under the Autonomous research brand has been suspended. Ratings and price targets are suspended temporarily, are no longer current, and should therefore not be relied upon.

Not Rated: A rating assigned when the stock cannot be accurately valued, or the performance of the company accurately predicted, at the present time. The covering analyst may continue to publish research reports on the company to update investors on events and developments.

Those denoted as ‘Feature’ (e.g., Feature Outperform FOP, Feature Under Outperform FUP) are our core ideas.

Not Covered (NC) denotes companies that are not under coverage.

Autonomous brand common stock ratings are based on a 12-month time horizon.

Autonomous brand – preferred stocks

The Autonomous brand has three categories of preferred stock ratings:

• Outperform (OP): The total return of the preferred instrument is expected to outperform preferred securities of other issuers operating in similar sectors or rating categories over the next six months.

• Neutral (N): The total return of the preferred instrument is expected to perform in line with preferred securities of other issuers operating in similar sectors or rating categories over the next six months.

• Underperform (UP): The total return of the preferred instrument is expected to underperform preferred securities of other issuers operating in similar sectors or rating categories over the next six months.

Autonomous preferred stock ratings are based on a 6-month time horizon.

AUTONOMOUS CREDIT RESEARCH

Where this report contains investment recommendations for credit instruments, as defined in article 3(1)(35) of the Market Abuse Regulation, the information below is presented to comply with its disclosure requirements.

The report may also include reference(s) to published opinions by other Autonomous or Bernstein analysts covering the equity securities of the issuer(s) referenced herein. Please note an investment recommendation for credit instruments published by the author(s) of this report may differ from the published view of the analyst covering equity securities for the issuer(s) contained in this report and vice versa

CREDIT RATINGS DEFINITIONS

The Autonomous brand has three categories of credit ratings:

• Credit Outperform (C-OP): The total return of the Reference Credit Instrument is expected to outperform the credit spread of bonds of other issuers operating in similar sectors or rating categories over the next six months.

• Credit Neutral (C-N): The total return of the Reference Credit Instrument is expected to perform in line with the credit spread of bonds of other issuers operating in similar sectors or rating categories over the next six months.

• Credit Underperform (C-UP): The total return of the Reference Credit Instrument is expected to underperform the credit spread of bonds of other issuers operating in similar sectors or rating categories over the next six months.

Autonomous credit ratings are based on a 6-month time horizon.

A list of all investment recommendations produced by the author(s) of this report alongside credit ratings history are available upon request.

It is at the sole discretion of the Firm as to when to initiate, update and cease research coverage. The Firm has established, maintains and relies on information barriers to control the flow of information contained in one or more areas (i.e. the private side) within the Firm, and into other areas, units, groups or affiliates (i.e. public side) of the Firm

DISTRIBUTION OF EQUITY RATINGS/INVESTMENT BANKING SERVICES <table><tr><td>Rating</td><td>Market Abuse Regulation (MAR) and FINRA Rule 2241 classification</td><td>Count</td><td>Percent</td><td></td><td>Count* Percent*</td></tr><tr><td>Outperform</td><td>BUY</td><td>620</td><td>51.07%</td><td>112</td><td>18.06%</td></tr><tr><td>Market-Perform (Bernstein Brand) Neutral (Autonomous Brand)</td><td>HOLD</td><td>420</td><td>34.60%</td><td>81</td><td>19.29%</td></tr><tr><td>Underperform</td><td>SELL</td><td>174</td><td>14.33%</td><td>19</td><td>10.92%</td></tr></table>

\* These figures represent the number and percentage of companies in each category to whom Bernstein and Autonomous provided investment banking services.

As of September 30, 2025. All figures are updated quarterly.

PRICE CHARTS/ RATINGS AND PRICE TARGET HISTORY

This research publication covers six or more companies. For price chart and other company disclosures, please visit https:// bernstein-autonomous.bluematrix.com/sellside/Disclosures.action or you can write to the Director of Compliance, Bernstein Institutional Services LLC, 245 Park Avenue, New York, NY 10167.

CONFLICTS OF INTEREST

An affiliate of Bernstein has received compensation for non-investment banking securities-related products or services in the previous twelve months from the following clients: Contemporary Amperex Technology Co Ltd.

Bernstein and/or affiliates have received compensation for non-investment banking securities-related products or services in the previous twelve months from the following clients: LG Chem Ltd, LG Energy Solution and Samsung SDI Co Ltd.

Bernstein has received compensation for non-investment banking securities-related products or services in the previous twelve months from the following clients: Samsung SDI Co Ltd.

Certain affiliates of Bernstein act as market maker or liquidity provider in the debt securities of: LG Chem Ltd and LG Energy Solution.

OTHER MATTERS

The legal entity(ies) employing the analyst(s) listed in this report, and their location, can be determined by the country code of their phone number, as follows:

+1 Bernstein Institutional Services LLC; New York, New York, USA

+44 Bernstein Autonomous LLP; London UK

+33 BSG France S.A.; Paris, France

+34 BSG France S.A.; Madrid, Spain

+41 Bernstein Autonomous LLP; Geneva, Switzerland

+49 BSG France S.A.; Frankfurt, Germany

+91 Sanford C. Bernstein (India) Private Limited; Mumbai, India

+852 Sanford C. Bernstein (Hong Kong) Limited 盛博香港有限公司; Hong Kong, China

+65 Sanford C. Bernstein (Singapore) Private Limited; Singapore

+81 Sanford C. Bernstein Japan KK; Tokyo, Japan

Where this report has been prepared by research analyst(s) employed by a non-US affiliate, such analyst(s), is/are (unless otherwise expressly noted below) not registered as associated persons of Bernstein Institutional Services LLC or any other SEC registered broker-dealer and are not licensed or qualified as research analysts with FINRA. Accordingly, such analyst(s) may not be subject to FINRA’s restrictions regarding (among other things) communications by research analysts with a subject company, interactions between research analysts and investment banking personnel, participation by research analysts in solicitation and marketing activities relating to investment banking transactions, public appearances by research analysts, and trading securities held by a research analyst account.

CERTIFICATION

Each research analyst listed in this report, who is primarily responsible for the preparation of the content of this report, certifies that all of the views expressed in this publication accurately reflect that analyst's personal views about any and all of the subject securities or issuers and that no part of that analyst's compensation was, is, or will be, directly or indirectly, related to the specific recommendations or views in this publication.

II. ADDITIONAL GLOBAL CONFLICT DISCLOSURES

It is at the sole discretion of the Firm as to when to initiate, update and cease research coverage. The Firm has established, maintains and relies on information barriers to control the flow of information contained in one or more areas (i.e., the private side) within the Firm, and into other areas, units, groups or affiliates (i.e., public side) of the Firm.

III. OTHER IMPORTANT INFORMATION AND DISCLOSURES

Separate branding is maintained for “Bernstein” and “Autonomous” research products.

• Bernstein produces a number of different types of research products including, among others, fundamental analysis and quantitative analysis under both the “Autonomous” and “Bernstein” brands. Recommendations contained within one type of research product may differ from recommendations contained within other types of research products, whether as a result of differing time horizons, methodologies or otherwise. Furthermore, views or recommendations within a research product issued under one brand may differ from views or recommendations under the same type of research product issued under the other brand. The Research Ratings System for the two brands and other information related to those Rating Systems are included in the previous section.

• Autonomous operates as a separate business unit within the following entities: Bernstein Institutional Services LLC, Bernstein Autonomous LLP, Sanford C. Bernstein (Hong Kong) Limited 盛博香港有限公司 and Sanford C. Bernstein (India) Private Limited. For information relating to “Autonomous” branded products (including certain Sales materials) please visit: www.autonomous.com. For information relating to Bernstein branded products please visit: www.bernsteinresearch.com.

Analysts are compensated based on aggregate contributions to the research franchise as measured by account penetration, productivity and proactivity of investment ideas. No analysts are compensated based on performance in, or contributions to, generating investment banking revenues.

This report has been produced by an independent analyst as defined in Article 3 (1)(34)(i) of EU 596/2014 Market Abuse Regulation (“MAR”) and the same article of MAR as it forms part of United Kingdom domestic law by virtue of the European Union (Withdrawal) Act 2018.

To our readers in the United States: Bernstein Institutional Services LLC, a broker-dealer registered with the U.S. Securities and Exchange Commission (“SEC”) and a member of the U.S. Financial Industry Regulatory Authority, Inc. (“FINRA”) is distributing this publication in the United States and accepts responsibility for its contents. Where this material contains an analysis of debt product(s), such material is intended only for institutional investors and is not subject to the US independence and disclosure standards applicable to debt research prepared for retail investors.

Bernstein Institutional Services LLC may act as principal for its own account or as agent for another person (including an affiliate) in sales or purchases of any security which is a subject of this report. This report does not purport to meet the objectives or needs of any specific individuals, entities or accounts.

To our readers in Canada: If this publication pertains to a Canadian domiciled company, it is being distributed in Canada by Sanford C. Bernstein (Canada) Limited, which is licensed and regulated by the Canadian Investment Regulatory Organization. If the publication pertains to a non-Canadian domiciled company, it is being distributed by Bernstein Institutional Services LLC, which is licensed and regulated by both the SEC and FINRA, into Canada under the International Dealers Exemption.

This document may not be passed onto any person in Canada unless that person qualifies as "permitted client" as defined in Section 1.1 of NI 31-103.

To our readers in Brazil: This report has been prepared by Bernstein Institutional Services LLC, and Banco BTG Pactual S.A. ("BTG") is responsible for the distribution of this report in Brazil.

To readers in the United Kingdom: This publication has been issued or approved for issue in the United Kingdom by Bernstein Autonomous LLP, authorised and regulated by the Financial Conduct Authority and located at 60 London Wall, London EC2M 5SH, +44 (0)20-7170-5000. Registered in England & Wales No OC343985.

This document is for distribution only to persons who (i) have professional experience in matters relating to investments falling within Article 19(5) of the Financial Services and Markets Act 2000 (Financial Promotion) Order 2005 (as amended, the “Financial Promotion Order”), (ii) are persons falling within Article 49(2)(a) to (d) (“high net worth companies, unincorporated associations, etc.”) of the Financial Promotion Order, (iii) are outside the United Kingdom, or (iv) are persons to whom an invitation or inducement to engage in investment activity (within the meaning of section 21 of the FSMA) in connection with the issue or sale of any securities may otherwise lawfully be communicated or caused to be communicated (all such persons together being referred to as “relevant persons”). This document is directed only at relevant persons and must not be acted on or relied on by persons who are not relevant persons. Any investment or investment activity to which this document relates is available only to relevant persons and will be engaged in only with relevant persons.

To our readers in the member states of the EEA: This publication is being distributed by BSG France SA, which is authorised and regulated by the Autorité de Contrôle Prudentiel et de Résolution (ACPR) and Autorité des Marchés Financiers (AMF).

To our readers in Hong Kong: This publication is being distributed in Hong Kong by Sanford C. Bernstein (Hong Kong) Limited 盛博香港有限公司, which is licensed and regulated by the Hong Kong Securities and Futures Commission (Central Entity No. AXC846) to carry out Type 4 (Advising on Securities) regulated activities and subject to the licensing conditions mentioned in the SFC Public Register (https://www.sfc.hk/publicregWeb/corp/AXC846/details)). This publication is solely for professional investors, as defined in the Securities and Futures Ordinance (Cap. 571).

To our readers in Singapore: This publication is being distributed in Singapore by Sanford C. Bernstein (Singapore) Private Limited, only to accredited investors or institutional investors, as defined in the Securities and Futures Act 2001 of Singapore ("SFA"). Recipients in Singapore should contact Sanford C. Bernstein (Singapore) Private Limited in respect of matters arising from, or in connection with, this publication. Sanford C. Bernstein (Singapore) Private Limited is regulated by the Monetary Authority of Singapore and licensed under the SFA as a capital markets services licence holder for dealing in capital markets products that are securities and collective investment schemes and an exempt financial adviser for advising on, issuing and promulgating analyses and reports on securities. Sanford C. Bernstein (Singapore) Private Limited is registered in Singapore with Company Registration No. 20213710W and located at One Raffles Quay, #27-11 South Tower, Singapore 048583, +65-6230-4612.

To our readers in the People’s Republic of China: The securities referred to in this document are not being offered or sold and may not be offered or sold, directly or indirectly, in the People's Republic of China (for such purposes, not including the Hong Kong and Macau Special Administrative Regions or Taiwan, the “PRC”) in contravention of any applicable laws of the PRC.

This document does not constitute an offer to sell or the solicitation of an offer to buy any securities in the PRC to any person to whom it is unlawful to make the offer or solicitation in the PRC.

We do not represent that this document may be lawfully distributed, or that any securities may be lawfully offered, in compliance with any applicable registration or other requirements in the PRC, or pursuant to an exemption available thereunder, or assume any responsibility for facilitating any such distribution or offering. In particular, no action has been taken by us which would permit a public offering of any securities or distribution of this document in the PRC. Accordingly, the securities are not being offered or sold within the PRC by means of this document or any other document. Neither this document nor any advertisement or other offering material may be distributed or published in the PRC, except under circumstances that will result in compliance with any applicable laws and regulations

To our readers in Japan: This publication is being distributed in Japan by Sanford C. Bernstein Japan KK (サンフォード・ C・バーンスタイン株式会社), which is registered in Japan as a Financial Instruments Business Operator with the Kanto Local Finance Bureau (registration number: The Director-General of Kanto Local Finance Bureau (FIBO) No.3387) and regulated by the Financial Services Agency. It is also a member of Japan Investment Advisers Association. This publication is solely for qualified institutional investors in Japan only, as defined in Article 2, paragraph (3), items (i) of the Financial Instruments and Exchange Act.

For the institutional client readers in Japan who have been granted access to the Bernstein website by Daiwa Securities Group Inc. (“Daiwa”), your access to this document should not be construed as meaning that Bernstein is providing you with investment advice for any purposes. Whilst Bernstein has prepared this document, your relationship is, and will remain with, Daiwa, and Bernstein has neither any contractual relationship with you nor any obligations towards you.

To our readers in Australia: Sanford C. Bernstein (Hong Kong) Limited 盛博香港有限公司 is responsible for distributing research in Australia. It is regulated by the Securities and Exchange Commission under U.S. laws, by the Financial Conduct Authority under U.K. laws, which differs from Australian laws. Sanford C. Bernstein (Hong Kong) Limited 盛博香港有限公司 is exempt from the requirement to hold an Australian financial services license under the Corporations Act 2001 in respect of the provision of the following financial services to wholesale clients:

• providing financial product advice;

• dealing in a financial product;

• making a market for a financial product; and

• providing a custodial or depository service.

To our readers in India: This publication is being distributed in India by Sanford C. Bernstein (India) Private Limited (SCB India) which is licensed and regulated by Securities and Exchange Board of India ("SEBI") as a research analyst entity under the SEBI (Research Analyst) Regulations, 2014, having registration no. INH000006378 and as a stock broker having registration no. INZ000213537. SCB India is currently engaged in the business of providing research and stock broking services. Please refer to www.bernsteinresearch.in for more information.

• SCB India is a Private limited company incorporated under the Companies Act, 2013, on April 12, 2017 bearing corporate identification number U65999MH2017FTC293762, and registered office at Level 3A, 4th Floor, First International Financial Centre, Plot Nos C-54 and C-55, G Block, Near CBI Office, Bandra Kurla Complex, Bandra (East), Mumbai 400098, Maharashtra, India (Phone No: +91-22-68421401).

• For details of Associates (i.e., affiliates/group companies) of SCB India, kindly email MUM-BERNSTEIN-InCompliance@bernsteinsg.com

• SCB India does not have any disciplinary history as on the date of this report.

• Except as noted above, SCB India and/or its Associates (i.e., affiliates/group companies), the Research Analysts authoring this report, and their relatives

• do not have any financial interest in the subject company

• do not have actual/beneficial ownership of one percent or more in securities of the subject company;

• is not engaged in any investment banking activities for Indian companies, as such;

• have not managed or co-managed a public offering in the past twelve months for any Indian companies;

• have not received any compensation for investment banking services or merchant banking services from the subject company in the past 12 months;

• have not received compensation for brokerage services from the subject company in the past twelve months;

• have not received any compensation or other benefits from the subject company or third party related to the specific recommendations or views in this report; and

• do not currently, but may in the future, act as a market maker in the financial instruments of the companies covered in the report.

• do not have any conflict of interest in the subject company as of the date of this report.

• Except as noted above, the subject company has not been a client of SCB India during twelve months preceding the date of distribution of this research report. Neither SCB India nor its Associates (i.e., affiliates/group companies) have received compensation for products or services other than investment banking, merchant banking or brokerage services from the subject company in the past twelve months.

• The principal research analyst(s) who prepared this report, members of the analysts' team, and members of their households are not an officer, director, employee or advisory board member of the companies covered in the report.

• Our Compliance officer / Grievance officer is Ms. Rupal Talati, who can be reached at +91-22-68421451, or MUM-BERNSTEIN-InCompliance@bernsteinsg.com / Scbin-investorgrievance@bernsteinsg.com

• The investor charter of SCB India is available on its website and may be accessed at Sanford C. Bernstein (India) Private Limited (bernsteinresearch.in)

• Disclaimer: Registration granted by SEBI, and certification from NISM, is in no way a guarantee of performance of the intermediary or provide any assurance of returns to investors. Investments in securities market are subject to market risks. Read all the related documents carefully before investing.

To our readers in Switzerland: This document is provided in Switzerland by or through Bernstein Autonomous LLP, and is provided only to qualified investors as defined in article 10 of the Swiss Collective Investment Scheme Act (“CISA”) and related provisions of the Collective Investment Scheme Ordinance and in strict compliance with applicable Swiss law and regulations. The products mentioned in this document may not be suitable for all types of investors. This document is based on the Directives on the Independence of Financial Research issued by the Swiss Bankers Association (SBA) in January 2008.

To our readers in the Middle East: Bernstein Autonomous LLP, DIFC branch has its principal office at Gate Village 06, DIFC, Dubai, UAE. Bernstein Autonomous LLP, DIFC branch is regulated by the Dubai Financial Services Authority (DFSA) with the registration number F008549 and is provisioned for Arranging Deals in Investments and Advising on Financial Products. All communications and services are directed at Professional Clients and Market Counterparties only (as defined in the DFSA rulebook). Persons other than Professional Clients and Market Counterparties, such as Retail Clients, are not the intended recipients of our communications or services.

LEGAL

All research publications are disseminated to our clients through posting on the firm's password protected websites, bernsteinresearch.com and autonomous.com. Certain, but not all, research publications are also made available to clients through third-party vendors or redistributed to clients through alternate electronic means as a convenience.

This publication has been published and distributed in accordance with the Firm's policy for management of conflicts of interest in investment research, a copy of which is available from Bernstein Institutional Services LLC, Director of Compliance, 245 Park Avenue, New York, NY 10167. Additional disclosures and information regarding Bernstein's business are available on our website www.bernsteinresearch.com.

The securities described herein may not be eligible for sale in all jurisdictions or to certain categories of investors where that permission profile is not consistent with the licenses held by the entities noted herein. This document is for distribution only as may be permitted by law. This publication is not directed to, or intended for distribution to or use by, any person or entity who is a citizen or resident of, or located in any locality, state, country or other jurisdiction where such distribution, publication, availability or use would be contrary to law or regulation or which would subject any of the entities referenced herein or any of their subsidiaries or affiliates to any registration or licensing requirement within such jurisdiction. This publication is based upon public sources we believe to be reliable, but no representation is made by us that the publication is accurate or complete. We do not undertake to advise you of any change in the reported information or in the opinions herein. This publication was prepared and issued by entity referred to herein for distribution to eligible counterparties or professional clients. This publication is not an offer to buy or sell any security, and it does not constitute investment, legal or tax advice. The investments referred to herein may not be suitable for you. Investors must make their own investment decisions in consultation with their professional advisors in light of their specific circumstances. The value of investments may fluctuate, and investments that are denominated in foreign currencies may fluctuate in value as a result of exposure to exchange rate movements. Information about past performance of an investment is not necessarily a guide to, indicator of, or assurance of, future performance.

This report is directed to and intended only for our clients who are “eligible counterparties”, “professional clients”, “institutional investors” and/or “professional investors” as defined by the aforementioned regulators, and must not be redistributed to retail clients as defined by the aforementioned regulators. Retail clients who receive this report should note that the services of the entities noted herein are not available to them and should not rely on the material herein to make an investment decision. The result of such act will not hold the entities noted herein liable for any loss thus incurred as the entities noted herein are not registered/ authorised/ licensed to deal with retail clients and will not enter into any contractual agreement/arrangement with retail clients. This report is provided subject to the terms and conditions of any agreement that the clients may have entered into with the entities noted herein. All research reports are disseminated on a simultaneous basis to eligible clients through electronic publication to our client portal. The information is private and confidential and for the use of the clients only.

This report has been prepared for information purposes only and is based on current public information that we consider reliable, but the entities noted herein do not warrant or represent (express or implied) as to the sources of information or data contained herein are accurate, complete, not misleading or as to its fitness for the purpose intended even though the entities noted herein rely on reputable or trustworthy data providers, it should not be relied upon as such. Opinions expressed are the author(s)’ current opinions as of the date appearing on the material only and we do not undertake to advise you of any change in the reported information or in the opinions herein.

This publication was prepared and issued by the entity referred to herein for distribution to eligible counterparties or professional clients. The information in this report is intended for general circulation and does not constitute an offer to buy or sell any security, investment, legal or tax advice nor a personal recommendation, as defined by any of the aforementioned regulators. It does not take into account the particular investment objectives, financial situations, or needs of individual investors. The report has not been reviewed by any of the aforementioned regulators and does not represent any official recommendation from the aforementioned regulators. The investments referred to herein may not be suitable for you. Investors must make their own investment decisions in consultation with advice sought from a financial adviser regarding the suitability of the investment product, taking into account the specific investment objectives, financial situation or particular needs of any recipient of the recommendation, before the recipient makes a commitment to purchase the investment product.

The analysis contained herein is based on numerous assumptions. Different assumptions could result in materially different results. The information in this report does not constitute, or form part of, any offer to sell or issue, or any offer to purchase or subscribe for shares, or to induce engage in any other investment activity. The value of any securities or financial instruments mentioned in this report may fluctuate subject to market conditions. Information about past performance of an investment is not necessarily a guide to, indicative of, or assurance of future performance. Estimates of future performance mentioned by the research analyst in this report are based on assumptions that may not be realized due to unforeseen factors like market volatility/fluctuation. In relation to securities or financial instruments denominated in a foreign currency other than the clients’ home currency, movements in exchange rates will have an effect on the value, either favorable or unfavorable. Before acting on any recommendations in this report, recipients should consider the appropriateness of investing in the subject securities or financial instruments mentioned in this report and, if necessary, seek for independent professional advice.

The securities described herein may not be eligible for sale in all jurisdictions or to certain categories of investors where that permission profile is not consistent with the licenses held by the entities noted herein. This document is for distribution only as may be permitted by law. It is not directed to, or intended for distribution to or use by, any person or entity who is a citizen or resident of or located in any locality, state, country or other jurisdiction where such distribution, publication, availability or use would be contrary to law or regulation or would subject the entities noted herein to any regulation or licensing requirement within such jurisdiction.

Source: Bloomberg Index Services Limited. BLOOMBERG® is a trademark and service mark of Bloomberg Finance L.P. and its affiliates (collectively “Bloomberg”). Bloomberg or Bloomberg’s licensors own all proprietary rights in the Bloomberg Indices. Neither Bloomberg nor Bloomberg’s licensors approves or endorses this material, or guarantees the accuracy or completeness of any information herein, or makes any warranty, express or implied, as to the results to be obtained therefrom and, to the maximum extent allowed by law, neither shall have any liability or responsibility for injury or damages arising in connection therewith.

No part of this material may be reproduced, distributed or transmitted or otherwise made available without prior consent of the entities noted herein. Copyright Bernstein Institutional Services LLC Bernstein Autonomous LLP, BSG France S.A., Sanford C. Bernstein (Hong Kong) Limited 盛博香港有限公司, Sanford C. Bernstein (Canada) Limited, Sanford C. Bernstein (India) Private Limited (SEBI registration no. INH000006378), Sanford C. Bernstein (Singapore) Private Limited and Sanford C. Bernstein Japan KK (サンフォード・C・バーンスタイン株式会社). All rights reserved. The trademarks and service marks contained herein are the property of their respective owners. Any unauthorized use or disclosure is strictly prohibited. The entities noted herein may pursue legal action if the unauthorized use results in any defamation and/or reputational risk to the entities noted herein and research published under the Bernstein and Autonomous brands.

研报原文

正文为转写文本,图表、公式与印章以 PDF 为准。

下载研报原文(PDF)